• English
  • Français (French)

Alstom Citadis 402 "Bordeaux"

demobordeaux.jpgThe Bordeaux tramway network (French: Tramway de Bordeaux ) consists of three lines serving the city of Bordeaux in southwestern France. The first line was opened on 21 December 2003; further extensions have increased the route length to 43.9 kilometres (27.3 mi).

The system is notable for using a ground-level power supply of the Alimentation par Sol (APS) system in the city centre.

source : wikipedia

Technicals datas in Simutrans :

vehicule speed power capacity weight gear energy disponibility
Citadis402_Bordeaux_1 90 km/h 180 kW/h 40 passengers 9 t *1 electric 2003-2023
Citadis402_Bordeaux_2 90 km/h NA 40 passengers 9 t NA electric 2003-2023
Citadis402_Bordeaux_3 90 km/h 180 kW/h 30 passengers 5 t *1 electric 2003-2023
Citadis402_Bordeaux_4 90 km/h NA 40 passengers 9 t NA electric 2003-2023
Citadis402_Bordeaux_5 90 km/h 180 kW/h 30 passengers 5 t *1 electric 2003-2023
Citadis402_Bordeaux_6 90 km/h NA 40 passengers 9 t NA electric 2003-2023
Citadis402_Bordeaux_7 90 km/h 180 kW/h 40 passengers 9 t *1 electric 2003-2023