Différences

Ci-dessous, les différences entre deux révisions de la page.

Lien vers cette vue comparative

Les deux révisions précédentesRévision précédente
Prochaine révision
Révision précédente
en:z50000 [2014/04/21 20:08] gauthieren:z50000 [2024/06/15 02:27] (Version actuelle) – modification externe 127.0.0.1
Ligne 7: Ligne 7:
 172 units are ordered in order to equip transilien lines J, L, H and P. Line H got the first trains. 172 units are ordered in order to equip transilien lines J, L, H and P. Line H got the first trains.
  
-There are two possible configurations for a Z50000 unit. Most of them have eight carriages, though some have seven carriages with a shortened central one.+There are two possible configurations for a Z50000 trainset. Most of them have eight carriages, though some have seven carriages with a shortened central one.
  
-**Data**+^Composition ^Speed ^Power ^Weight ^Capacity | 
 +^7 vehicles  |140 kmph |1.2 2620 kW |210 t |755 passengers | 
 +^8 vehicles  |140 kmph |1.2 2620 kW |235 t |922 passengers |
  
-^Name ^Speed ^Power ^Weight ^Capacity | 
-^SNCF_z50000_front \\ SNCF_Z50000_rear  |140 km/h |524 kW |33 t |107 passengers | 
-^SNCF_Z50000_car1 \\ SNCF_Z50000_car4  |140 km/h |524 kW |32 t |118 passengers | 
-^SNCF_Z50000_car2  |140 km/h |524 kW |31 t |118 passengers | 
-^SNCF_Z50000_car3  |140 km/h |0 kW |31 t |118 passengers | 
-^SNCF_Z50000_car  |140 km/h |0 kW |21 t |118 passengers | 
-^SNCF_Z50000_short_car |140 km/h |0 kW |17 t |69 passengers | 
  
- +<WRAP download>{{fr:trainsfr:SNCF_z50000.pak}} \\ {{fr:trainsfrsource:z50000.zip|Source files}}</WRAP>
-<WRAP download>{{fr:trainsfr:SNCF_z50000.pak}}</WRAP>+
 [[en:trainsfr|Back]] [[en:trainsfr|Back]]