Différences

Ci-dessous, les différences entre deux révisions de la page.

Lien vers cette vue comparative

Les deux révisions précédentesRévision précédente
Prochaine révision
Révision précédente
en:mi09 [2014/04/21 20:09] gauthieren:mi09 [2024/06/15 02:27] (Version actuelle) – modification externe 127.0.0.1
Ligne 6: Ligne 6:
 These trains are based on class MI 2n which already serve RER line A and E. They're built by both Alstom and Bombardier. They also feature CCTV cameras and a system of information for passengers including screens. The first train is inaugurated by president Nicolas Sarkozy at station La Défense (West of Paris) on December 5, 2011. These trains are based on class MI 2n which already serve RER line A and E. They're built by both Alstom and Bombardier. They also feature CCTV cameras and a system of information for passengers including screens. The first train is inaugurated by president Nicolas Sarkozy at station La Défense (West of Paris) on December 5, 2011.
  
-MI 09 are run in either simple or double units, each one being composed of five carriages : three propelled ones surrounded by two cars.+MI 09 drive in either simple or double units, each one being composed of five carriages : three propelled ones surrounded by two cars.
  
-**Data**+^Composition ^Speed ^Power ^Weight ^Capacity | 
 +^C+3L+C  |120 kmph |0.8 4500 kW |289 t |1355 passengers |
  
-^Name ^Speed ^Power ^Weight ^Capacity | +\\ \\
-^RATP_MI09_front \\ RATP_MI09_rear  |120 km/h |0 kW |44 t |265 passengers | +
-^RATP_MI09_car  |120 km/h |1500 kW |67 t |275 passengers |+
  
-\\ +<WRAP download>{{fr:trainsfr:RATP_MI09.pak}} \\ {{fr:trainsfrsource:mi09.zip|Source files}}</WRAP>
- +
-<WRAP download>{{fr:trainsfr:RATP_MI09.pak}}</WRAP>+
 [[en:trainsfr|Back]] [[en:trainsfr|Back]]