Traductions possibles :

Différences

Cette page vous donne les différences entre la révision choisie et la version actuelle de la page.

en:z5600 [2015/02/18 11:05]
127.0.0.1 édition externe
en:z5600 [2015/07/30 15:04] (version actuelle)
gauthier
Ligne 9: Ligne 9:
Firstly used in four carriages trainsets, two carriages have been added so as to gain capacity (at the expense of a loss of acceleration). Firstly used in four carriages trainsets, two carriages have been added so as to gain capacity (at the expense of a loss of acceleration).
-**Data**+^Composition ^Speed ^Power ^Weight ^Capacity | 
 +^L+2C+L  |140 kmph |1.0 * 2800 kW |212 t |836 passengers | 
 +^L+4C+L  |140 kmph |1.0 * 2800 kW |294 t |1332 passengers |
-^Name ^Speed ^Power ^Weight ^Capacity | +\\ \\
-^SNCF_z5600_ZB1 \\ SNCF_Z5600_ZB2  |140 km/h |1400 kW |65 t |170 passengers | +
-^SNCF_z5600_ZRB \\ SNCF_Z5600_ZRAB  |140 km/h |0 kW |41 t |248 passengers | +
- +
-\\+
<WRAP download>{{fr:trainsfr:SNCF_Z5600.pak}} \\ {{fr:trainsfrsource:z5600.zip|Source files}}</WRAP> <WRAP download>{{fr:trainsfr:SNCF_Z5600.pak}} \\ {{fr:trainsfrsource:z5600.zip|Source files}}</WRAP>
[[en:trainsfr|Back]] [[en:trainsfr|Back]]