Table des matières

Sprague-Thompson series

Part of the underground network of Paris (France)

Trainset M500

Main presentation

The Sprague-Thomson was conceived in 1908 by the synthesis of already-existing systems. Beginning in 1907, the CMP was constructing metallic stock. The motrices 500 (motor cars) formed the first series of Sprague-Thomson, which was referred to familiarly as simply “Sprague”. The cars were constructed entirely of metal and had two motors.

http://en.wikipedia.org/wiki/Sprague-Thomson

engine referred to as a “grande loge” is M500 and associated cars are Bb170 for 2nd class and Ab167 for 1st class.

Period when this set appears is 1908 to 1930

Caracteristics

Icon Name Caracteristics
M500 payload=20, speed=45, power=750, gear=105, weight=10, cost=120000, runningcost=90, intro_year=1908, intro_month=1, retire_year=1930, retire_month=12
Bb170 payload=30, speed=45, weight=8, cost=80000, runningcost=50, intro_year=1908, intro_month=1, retire_year=1930, retire_month=12
Ab167 payload=40, speed=45, weight=8, cost=80000, runningcost=50, intro_year=1908, intro_month=1, retire_year=1930, retire_month=12

Views

Trainset on underground station

Trainset is coming into underground station

Trainset M4

Main presentation

vue wikipedia This suite,most famous and representative of parisian metropolitan network is born after world war I. It was used from 1926 to 1983. driver places (petite loge in french) was reduced to offer more space for passengers. Normal trainset had 5 vehicles (M-Bb-Ab-Bb-M).

trainset elements were renewed after the Second World War and were replaced little by little during the appearance of the series MF 67

This pakset has one front (and back) engine named M.1000, one 2nd cl. car named Bb.300 and 1st cl. car named Ab.400 (middle of trainset).






Caracteristics

Icon Name Caracteristics
M1000 payload=55, speed=65km/h, power=750, gear=105, weight=12t, cost=14000, running cost=90, introducing date=1928/01/01, retirement date=1980/12/31
Bb300 payload=58, speed=65km/h, weight=10t, cost=10000, running cost=50, introducing date=1928/01/01, retirement date=1980/12/31
Ab400 payload=58, speed=65, weight=10t, cost=10000, running cost=50, introducing date=1928/01/01, retirement date=1980/12/31

Views

 trainset M4 coming to station trainset M4 running

Back to underground trainsets